New construction

Confirm pathways and device locations while walls and ceilings are open.

Request a Quote
Network cable pathways through open framing

How the work comes together

Confirm pathways and device locations while walls and ceilings are open.

  1. Coordinate before close-inReview device locations and cable routes with the construction team before framing and ceilings are covered.
  2. Record concealed routesCapture photos and marked drawings while pathways are still visible.
  3. Review the resultsAgree on which connections and records your IT team needs at handoff.
Read the planning guide
A cable route from the ceiling tray to a wall outlet
A cable route from the ceiling tray to a wall outlet.

Testing the installation

Capture photos and marked drawings while pathways are still visible.

See the testing and handoff guide
Technician and IT manager reviewing installation test results

New construction video

Narrated overview of new construction.

Frequently asked questions

What should we check before the work starts?

Review device locations and cable routes with the construction team before framing and ceilings are covered.

What should we verify before handoff?

Capture photos and marked drawings while pathways are still visible.

How can we get a quote?

Share your site details, schedule and any access or downtime constraints.

Related industries

Services for this setting

Free planning tools

Free Site Visit & Consultation

Fast estimates and same-day quotes are available when we have enough detail to price the work. Tell us about your site and what you need installed.

tech@thenetworkinstaller.com

Cable routing plan and installation tools

What to have ready

Have the project address, property type, target date, and a floor plan or site photo ready. If you have multiple sites, include the site count and any differences in scope.