The Network
Installer
← All guides

New construction planning guide

Confirm pathways and device locations while walls and ceilings are open.

Network cable pathways through open framing

Coordinate before close-in

Review device locations and cable routes with the construction team before framing and ceilings are covered.

Record concealed routes

Capture photos and marked drawings while pathways are still visible.

View new construction and watch the video

Request a Quote

Free Site Visit & Consultation

Fast estimates and same-day quotes are available when we have enough detail to price the work. Tell us about your site and what you need installed.

tech@thenetworkinstaller.com

Cable routing plan and installation tools

What to have ready

Have the project address, property type, target date, and a floor plan or site photo ready. If you have multiple sites, include the site count and any differences in scope.